Conserve Water, without which, it is all wilderness : Back 
KANPUR
Initially the water supply system consisted of 190 MLD water treatment plant that draws raw water from the river Ganga and 76 tube wells which supply 110 MLD clear water to the town. In order to make up the shortfall of about 200 MLD, to meet the present demand of water, the following works have been executed and commissioned under the World Bank Aided programme. The estimated cost of the project is about Rs. 15.00 crores.
Water treatment plant - 110 mid.
Ground reservoir - 700 KI.
Feeder main of 500mm dia P S. C. pipes - 2350 m.
Clear water pumping station - 110 mid.
Raw water main consisting of PS.C.pipes 1200mmdia-1685m
LUCKNOW
The following works pertaining to the Second Water Works costing Rs. 18.65 crores were completed and commissioned in the year 1996 under the World Bank Aided Programme to provide additional 96 MLD clear water to the town:
Raw water intake well 13.5 m dia and pump house
Raw water rising main consisting of 900 mmdia. PS.C.pipes 1500 m long
Water treatment plant - 96 mid
R. C. C. clear water ground reservoir, 2 ml capacity
800 / 900 mm dia clear water feeder mainconsisting of P.S.C. pipes 4500 m long.
750 / 500 / 450 mm CI pipe line feeder main 3000 m.long.
 
GHAZIABAD
Ghaziabad is one of the most important towns of Uttar Pradesh due to its close proximity with the national capital Delhi. It is a satellite town of Delhi. Under the External Water Supply Scheme (Augmentation) for the Vaishali, Kaushambi & Indirapuram townships of Ghaziabad, 28 deep tubewells, 5 ground reservoirs of capacities ranging from 500 KL to 2500 KL, 5 overhead tanks of capacities ranging from 1500 KL to 2000 KL and 22 m staging and conveyance mains consisting of 1500 mm dia P.S.c. pipes, 11,250 m long have been completed and commissioned in 1998 at the estimated costofRs.19.33crores. Water Supply to Various Hospitals in U.P. :
Water supply works on turnkey basis have been completed in various hospitals in U. P. costing Rs. 928.90 lakhs.
DELHI
It is proudly recorded here that we have executed cross regulator and head works on the Ganga Canal at Muradnagar for tapping 200 cusecs of water for augmentation of water supply to Delhi. For conveyance of 200 cusecs of water 2800 mm dia cast-in-situ, RCG, barrel was designed, constructed from Muradnagar to Delhi in a length of about 21 Kms. The total cost of the project was 8.50 crores. These works were completed and commissioned in 1980 and are also being maintained by us. In order to further augment the water supply by 300 cusecs from the same source, the work of design and execution has also been entrusted to us.
 
 